Construction has been moving at a rapid pace lately. Here’s a photo of the piping for the in-floor radiant heating, just before the concrete slab was poured. It won’t be too long until the basement communal kitchen and dining room are finished.
![](https://www.rejeneratecoop.org/wp-content/uploads/2024/03/Screenshot-2024-03-11-164753-766x1024.png)
The outside has seen a lot of progress as well. Window trim has been installed, and siding is on the way. Stay up to date with construction on Facebook and Instagram.
![](https://www.rejeneratecoop.org/wp-content/uploads/2024/03/windows-993x1024.png)